With support from the University of Richmond

History News Network puts current events into historical perspective. Subscribe to our newsletter for new perspectives on the ways history continues to resonate in the present. Explore our archive of thousands of original op-eds and curated stories from around the web. Join us to learn more about the past, now.

Engineering the Berlin Tunnel

Fifty years ago, the CIA embarked on a project to intercept Soviet and East German messages transmitted via underground cable. Intelligence was collected to determine the best place to hit the target, and then concrete planning for a new collection site was begun.

The tunnel was 1,476 feet in length and consumed 125 tons of steel liner plate and 1,000 cubic yards of grout . . . This was not a small operation!
Read entire article at CIA